综合久久影院-综合久久伊人-综合久久一区二区三区-综合久久五月天-亚洲欧美日韩国产一区图片-亚洲欧美日韩国产一区二区三区精品

Muen
News

News

Enterprise service provider

location : Home > News > Technical information

The bearing capacity of high-voltage inverter for external faults and the fault recovery time of equipment

2023-05-20 13:35:30

The influence of external fault on input side, such as bus voltage drop caused by external power grid fault, on the operation of high voltage inverter. A power plant unit in Guangdong Province once had such an accident: due to the transient fault of the external power grid, the auxiliary power bus voltage flickered and dropped, leading to the shutdown of the auxiliary frequency converter. Although the fault of the external power grid was removed quickly, the important auxiliary equipment driven by the frequency converter stopped, which led to the unit load rejection. Therefore, the re start function of instantaneous power failure should be a reliable guarantee to improve the bearing capacity of external fault of high-voltage inverter of auxiliary equipment of power plant.


The influence of external faults on the output side, such as cable breakdown and short circuit, single-phase grounding or even phase to phase short-circuit fault on high-voltage inverter. The high-voltage inverter shall be equipped with single-phase grounding fault detection function, and set alarm or trip protection according to site conditions. According to statistics, there are about 20 sets of phase to phase short circuit fault caused by insulation damage of high-voltage motors in Guangdong Province every year. Although the relative probability is small, the impact of short-circuit current on the equipment of high-voltage inverter with extremely limited over-current capacity is huge, which may lead to serious fault of equipment damage. The bearing capacity and protection technology of high voltage inverter to output phase to phase short circuit is an important factor to be considered in equipment selection and equipment safety assurance.


Equipment faults can be divided into two types: one is the fault that can be recovered instantly. Once the fault occurs, it can recover itself in a short time. The frequency conversion device with automatic speed tracking function can significantly improve the operation ability and reliability under such fault conditions. Some of the high-voltage inverters in Guangdong Province are frequently shut down when lightning strikes in thunderstorm season;


The other is the recovery time of the device after permanent failure. The power unit modularization can replace the standby module in a short time, so that the equipment can resume operation in a short time.


General purpose frequency converter


label

QR code

The public,

Mobile station
The public, Mobile station

Contact

未標題-8.png 0755-81719517
未標題-10.png0755-81719530 未標題-11.png[email protected]
未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

Navigation

Home          About

Product      Case

Solution      Service

Job      News

Contact          

Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
主站蜘蛛池模板: 五月天婷婷综合 | 欧美日韩中文在线视频 | 激情天堂 | 免费观看亚洲 | 亚洲美女性生活视频 | 伊人色综合网一区二区三区 | 在线精品日韩一区二区三区 | 国产精品欧美一区二区三区 | 四虎影院久久久 | 国产麻豆久久 | 综合网在线视频 | 日本三级一区二区三区 | 中国毛片视频 | 英语课强插英语课代表 | 青青伊人网 | 一本大道香焦在线视频 | 国产免费观看a大片的网站 国产免费高清在线精品一区 | 免费韩国美女爽快一级毛片 | 手机在线观看黄色网址 | 丁香综合缴情六月婷婷 | 青青青草国产线观 | 日本一区免费观看 | 亚州免费一级毛片 | 亚洲看| 日韩在线二区 | 亚洲操穴 | 久久99精品久久久久久久不卡 | 国产精品午夜久久久久久99热 | 国产满18av精品免费观看视频 | 欧美激情综合亚洲五月蜜桃 | 麻豆传煤适当放松一下自己 | 99国产视频| 亚洲b | 精品在线视频免费观看 | 久草精彩视频 | 欧美黄色大片免费 | 四虎视屏| 欧美天天干 | 久久久不卡国产精品一区二区 | 国产h视频在线观看 | 污网站在线观看 |