What to check before the soft starter is powered on?

2023-05-20 11:27:04

Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


First, check the wiring


1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


Third, check the motor


1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


通用變頻器


label

QR code

The public,

Mobile station
The public, Mobile station

Contact

未標題-8.png 0755-81719517
未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

Navigation

Home          About

Product      Case

Solution      Service

Job      News

Contact          

Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
主站蜘蛛池模板: 日本一区不卡在线观看 | 欧美在线视频一区 | 国产在线更新 | 日韩国产另类 | 青青草国产免费 | 欧美高清不卡 | 成人午夜网 | 日韩美一区二区三区 | 国产麻豆久久 | 日韩岛国大片 | 一及黄色毛片 | 亚洲狠狠ady亚洲精品大秀 | 亚洲综合91社区精品福利 | 国模福利在线观看视频 | 久久免费视频1 | 国产欧美国产精品第一区 | 日本中文在线观看 | 最近新韩国日本免费看 | 99热在线观看精品 | 国产精品欧美久久久久天天影视 | 麻豆视频秘密入口 | 欧美亚洲国产成人高清在线 | 色欧美片视频在线观看 | 中文字幕在线看日本大片 | 日本亚洲高清乱码中文在线观看 | 国产chinese视频在线观看 | 99视频在线观看视频 | 榴莲丝瓜黄瓜草莓向日葵污苹果 | 日本精品久久 | 99久久中文字幕伊人 | 久久综合九色综合欧美播 | 成人网在线播放 | 久热中文字幕在线精品首页 | 欧美日韩中文国产 | 欧美图片在线观看 | 日韩精品欧美国产精品亚 | 在线观看91精品国产剧情免费 | 一级做a爰片欧美一区 | 欧美成人免费全网站大片 | 成人免费a视频 | 日韩欧美综合在线二区三区 |